2016 – Canada
Greenhouse for tomatoes, expansion of 60.000 m², boilerhouse with interconnection to existing boilerhouse.
Tuberail/trolley heating, growpipe heating, separately controlled gable heating systems.
2 Boilers of 8.400 kW each, with condensor and CO₂ fan. Hot water storage tank of 5.000 m³.
Heating systems, boilerhouse, underground transportlines, main manifold in the boilerhouse, sub manifolds in the greenhouse.
Design calculations, P&ID flowscheme, drafting, material lists/work preparation.
Support with start-up of the boilerhouse installations and design of the control sequence of the interconnection between ‘old’ and new boilerhouse.